• Laboratory and Office FitOut Construction Philadelphia
  • Medical Reasearch Lab FitOut Philadelphia
  • radipharma lab fitout Construction Audubon
  • ndri lab fitout Construction
  • lab office Construction FitOut Philadelphia
Integral Molecular Lab Fit-Out
Philadelphia, PA
Fit-out of 9,835 sf of new laboratory and office space in the Science Center at 3711 Market Street. The work included mechanical, electrical, and lab waste plumbing systems, baked enamel lab casework and chemical resistant counters, an autoclave, a glass washer, deionized and reverse osmosis water systems, piped medical gas, systems furniture, and a conference center.
Drexel Medical Research Lab
Philadelphia, PA
Fit out 1200sf of new wet lab space for Drexel University at the 3711 Market Street Science Center. Construction included a Darkness Room with an incubator and a biosafety cabinet, a Work Room, and a Wet Lab with moveable benches, two permanent BMC laboratory fume exhaust hoods, and a flexible snorkel exhaust.
AVID Radiopharmaceuticals
Philadelphia, PA
Renovation and expansion of a 14,000 sf research and development facility. Renovations included new administrative and office space, clinical space with new labs, a dark room, an instrument testing room, a hot lab for radioactive materials, a quality control room, clean rooms, and a quarantine area. New HVAC, exhaust hoods, a nitrogen generator, compressed air and medical gas distribution, and upgraded electrical distribution were also required.
National Disease Research Institute Lab
Philadelphia, PA
Six-week fit-out of 1,845 square foot of laboratory space, including the procurement of specialty items. The scope included a Work Lab, Bio-Safety Area, and Freezer Room housing fourteen tissue freezers and liquid nitrogen storage tanks. Special requirements included chemical resistant work surfaces, fire rated and acid resistant casework, a high-volume fume hood with constant volume bypass, and independent mechanical systems for heating and cooling.
Global Soft Landing
Philadelphia, PA
Fit-out of 3,100 sf of laboratory and meeting space. Amenities included laboratory benches, metal casework, chemical fume hoods, shower & eye-wash stations, autoclave, cold room, glassware washer, de-ionized water, centrifuges, and other laboratory instruments.
New Construction
Renovation
TI – Tenant Improvement
Fit-Out
Exhaust & Evacuation
Clean Rooms
Hazardous Materials
Take a New Approach